Skip to content
Locally owned · Veteran owned · Se habla españolOpen every day, 5 AM to 10 PM
San Jose Concrete logo Call (408) 790-0568
New concrete pad beside a stucco backyard unit with a wooden door in San Jose, CA

ADU Concrete Slabs in San Jose CA

A backyard cottage starts with a foundation that has to pass plan check and carry a real home. We pour it to your drawings, with the utilities in place and inspections lined up.

  • Built to your plans
  • Utilities coordinated
  • Free estimates

Everyone seems to know someone building a backyard cottage. A parent who is moving closer, a grown kid who needs a place, a rental that will help with the mortgage. The drawings look wonderful. The lemon tree in the corner has to go. And the slab, which nobody can see, has to be exactly right.

ADU concrete slabs in San Jose CA sit between a simple patio and a full house foundation. They carry walls, a roof, plumbing and people, so they follow engineered plans, city inspections and a careful order of work.

What makes ADU concrete slabs different from a patio

A patio is poured on prepared dirt. An ADU slab has thickened edges that act as footings, steel in a set pattern, plumbing and electrical lines under it and hardware that ties the wood frame to the concrete. The city checks each piece before concrete is placed.

The plans show the details. Our job is to read them closely, build exactly that and tell your designer early if something on site does not match.

Wooden form boards set around bare soil for a backyard unit slab in San Jose, CA

The city and the plan check

San Jose reviews ADU plans through its permit office, and the foundation sheet shows the slab details, footing layout and steel. The city may ask for a soils report or a foundation design from an engineer, and it also lets some projects use set footing sizes or match an existing foundation.

State rules allow many backyard homes up to a certain size with modest setbacks, but your drawings and your lot decide what is possible. We read the plans, not guess from the rules.

Trenches first, ADU concrete slabs second

Before concrete goes in, sewer, water, gas and electric lines must be placed or stubbed up at the right spots. Mistakes here are painful, since moving a drain after the pour means cutting into new concrete. We coordinate with your plumber and electrician and check each location against the plans.

Working near the main house, we also find out where old lines run, so no one hits a sprinkler or a gas line. USA North 811 marks public utilities before we dig.

New concrete slab with clean edges beside a lawn and a wooden fence in San Jose, CA

Getting a truck, a pump and a crew into the backyard

Side yards in San Jose can be tight. When a mixer truck cannot reach, we use a pump with a long hose or move concrete by wheelbarrow. Plan the path early, and tell the neighbors about the pour day.

If your cottage is a garage conversion, see our garage floor page and the cutting page, since the existing slab may need changes.

Before you call

Bring what you have.

  • Plans, even if the permit is still in review
  • The soils report, if one was ordered
  • Photos of the path from the street to the build site
  • Your contractor, plumber and designer contacts

Backyard cottage questions from real families

We are planning a detached ADU in the backyard. What should the slab look like?

ADU concrete slabs come from your plans, and the plans come from your designer and, often, an engineer. In general, an ADU slab is a thick concrete floor with thickened edges around the perimeter, steel bars or mesh inside and a prepared rock base underneath. Plumbing and electrical lines run through it in the places the drawings show.

The edges act like footings and carry the weight of the walls. In our clay soil, the engineer may call for deeper edges or extra steel. A moisture barrier goes under the slab to keep the floor dry. Hold downs and anchor bolts are set in the wet concrete to tie the frame to the foundation.

We do not invent the design. We build what the plans say, and we speak up if a detail seems hard to build. The best time to talk to us is while the drawings are still being made. Share the draft, and we will point out practical issues, like where the truck will park or where steel might be crowded. That saves back and forth with the city later.

Does the city require a soils report for an ADU slab?

It can. The city may ask for a soils report, which is a study of the dirt under your backyard, and a foundation design based on it. Some projects are allowed to use standard footing sizes or match the existing foundation, depending on the plan. Your designer will know which path fits.

The soil matters a great deal here. Parts of the Santa Clara Valley sit on expansive clay, and some hillside lots have slopes and loose material. A soils report tells the engineer how deep the footings should go, how much weight the ground can carry and whether special measures are needed.

If you are not sure, ask your designer early. A report takes time to order and complete, and it can affect the budget. We read soils reports closely and follow their notes on excavation and base. If the report says to remove soft material, we do it. Bring a copy to the first visit, and we will tell you how it shapes the concrete work. Our foundation installation page covers that process in more detail.

Who handles the plumbing and electrical lines that go under the slab?

Your plumber and electrician do, and we work with them. Before the pour, lines for sewer, water, gas and power are installed in the trenches or sleeves, in the exact locations the plans show. Some are inspected before concrete goes in. Others pass through the slab and rise at the right spots for the walls and fixtures.

We coordinate the timing so the trades are not on top of each other. The sequence goes like this: we excavate, the plumber sets drains, we set steel, the electrician installs conduits, the city inspects and then we pour. Each step depends on the one before it.

Mistakes are costly, since moving a drain after the slab is poured means cutting into new concrete. So we measure from reference points, check against the plans and ask the plumber to confirm. If you are acting as your own general contractor, we help you understand the order. We can also leave a sleeve for future lines, like a spare conduit for a solar panel or a heat pump. A little planning now saves plenty later.

How early should we call a concrete contractor in the ADU process?

Earlier than most people expect, because ADU concrete slabs sit early in the schedule. The best time is while the plans are being finalized, before they go to the city. That way we can look at the site, point out access problems and spot any details that will be hard to build. We can also give a price range that helps you set the budget.

If you already have approved plans, call as soon as you know your target start date. Concrete crews book up, and inspections have their own timing. A slab that is ready late holds up framers, roofers and everyone else.

We suggest a visit with your designer or general contractor present if possible. Walk the path from the street to the site, mark the corners and check for trees, utilities and fences. That one meeting prevents many surprises. Ask us any question, however small. Our crew has worked on backyard projects around Santa Clara County, and we know how stressful the process can feel. The goal is for the slab to be the easy part, and we would love to help make that so.

What if our backyard is too narrow for a concrete truck?

ADU concrete slabs in tight yards have options. A concrete pump uses a long hose to move concrete from the truck over the house or around the corner. It is more expensive than a chute, but it reaches places that a truck cannot. The hose can run through a side yard, over a fence or across a roof.

For smaller slabs, wheelbarrows and carts can move concrete from the street to the form. That takes more people and more time, and the concrete needs to be placed before it starts to set. We plan the crew size to match.

The path also matters. Gates must be wide enough, steps may need ramps and low branches or wires need to be cleared. We walk the path at the visit and note every obstacle. In some cases, we remove a section of fence for the day and put it back after. Tell the neighbors about the plan, since a pump truck is loud and visible. Our slab page has more on how we handle tight sites.

Can an existing garage slab be used for a garage conversion ADU?

Sometimes. The existing slab has to be in good shape, thick enough and compatible with the plans. The city may require an engineer to check it, and a moisture barrier, insulation or a new floor build up may be needed. Many garage slabs slope toward the door, which must be corrected for a living space.

We look at cracks, levels, thickness and the condition of the base. If the slab is sound, we may only need to cut openings for plumbing, patch them and level the surface. If it is poor, replacing it can be cleaner. We also check for post tension cables and radiant heat pipes, which are important to find before cutting.

The garage door opening usually gets filled with a wall, and the new wall needs a proper footing. That is a small but important piece of concrete work. Tell us what you want the space to be, and we will assess the slab and suggest a path. A quick visit often settles the question. If you want to save the old slab, we try. If it is not suitable, we say so.

Backyard cottage on the way? Call (408) 790-0568 or send your plan set with the estimate form, and we will look at the slab side together.

Find us

San Jose Concrete

1767 Ledgewood Dr
San Jose, CA 95124

Get Directions

Open every day, 5 AM to 10 PM. Please call (408) 790-0568 to set up a time, since our crew is often out on a job.

Call (408) 790-0568