Nobody puts a photo of a footing on the refrigerator. After the pour, it is buried, backfilled and forgotten. Then one wet winter, a fence leans, a deck post sinks or a porch begins to pull away from the wall, and everyone suddenly remembers footings.
Concrete footings in San Jose CA do a quiet, heavy job. They spread the weight of a structure across soil that can swell, shrink and shift. When they are right, nobody ever notices. When they are wrong, everybody does.
Why concrete footings get the most attention
Concrete footings are wide, thick bases under a wall, post or column. It is wider than whatever sits on it, so the load spreads out and the soil does not get squeezed in one small spot.
Think of snowshoes. A person sinks into soft snow in boots and walks across it in snowshoes. Concrete footings are the snowshoes for your deck, your wall and your addition.

Clay, depth and the soil report
Here the issue is not frost, because the ground does not freeze deep. The issue is clay that moves with moisture. Footings have to reach soil that stays steady, below the top layer that dries and swells.
For larger projects, an engineer may order a soils report that tells us how deep to go and how much weight the ground can carry. We follow those plans exactly and bring them to the inspector.
Steel, spacing and an inspection that matters
Inside every footing is steel, called rebar, set at specific heights and spacing. It keeps the concrete from cracking under load. We tie the bars, set them on supports so they sit in the middle of the pour and call for the city inspection before concrete goes in.
That inspection is not a hurdle. It is a second pair of eyes, and the whole reason the work is trustworthy years later.

Posts, decks, fences and retaining walls
Deck posts sit on isolated footings, each one a small pad of concrete. Fences may use post holes filled with concrete. A wall needs a continuous footing, a long strip along its length. Our retaining wall page explains how footings help hold back a hillside.
Additions and new rooms tie into a foundation, covered in our foundation page.
Before you call
Have these items ready.
- What will sit on the footing: a deck, a wall, a porch, a room?
- Do you have plans or a drawing from a designer or engineer?
- Where are the nearest sprinkler lines, pipes and trees?
- Is the ground sloped or flat at that spot?
Footing questions people actually ask
We're building a deck about four feet off the ground. How deep and wide should the footings be?
There is no single number, because it depends on the deck size, the load it will carry and the soil. A deck that holds a hot tub and a dozen guests needs bigger footings than one with two chairs. Local building departments publish minimum sizes for decks, and an engineer may be needed for taller or heavier ones.
In general, concrete footings for decks in our area are round or square pads dug a certain depth into firm soil, often with a bit of gravel under them and a metal bracket set into the concrete for the post. The width spreads the load so the clay does not squeeze out under it.
We do not guess. We look at your plans, check with the city rules for your address and set the footings to match. For decks attached to a house, the connection to the wall is important too, so we coordinate with whoever is building the deck. If you have a drawing, send a photo before the visit. If not, we will talk through the project and sketch one together.
Do we need to worry about frost depth here?
Not in the way people do in cold states. In the Santa Clara Valley the ground does not freeze deep, so there is no big frost depth rule like you would see in the Midwest. The thing to worry about is our clay soil, which swells in the wet months and shrinks in the dry ones.
That swelling is why footings are dug into steady soil, below the top layer that moves the most. Concrete footings in clay also need to be wide enough that the soil does not squeeze out from under them, and they need good drainage so water does not collect beside them.
On hillsides, there is another factor: slope. Footings on a slope may need to be stepped, each section dug to a level depth, so the concrete does not slide. Your plans or the city will set the exact numbers. We follow them to the inch. If you are not sure what your lot needs, ask us during the estimate. We know the local requirements and will point you in the right direction.
What's the difference between a footing and a foundation?
A footing is the wide base at the bottom, under the walls. A foundation is the whole system that carries the building, which includes footings, stem walls or slabs and sometimes piers. The footing is one part of that system.
People use the words loosely, and both are fine in daily talk. For planning, it helps to know that a footing is usually poured first, in a trench or hole, and that it must pass inspection before anything is built on top of it. Then the walls go up or the slab is poured.
Smaller projects, like a fence or a small deck, only need footings. Bigger ones, like a house, an addition or a backyard cottage, need the whole foundation. If your project is one of the bigger ones, our foundation installation page explains what happens next. If you are not sure which you need, describe what you are building and we will tell you.
Will the city inspect the footings before the concrete goes in?
For most projects that need a permit, yes. The inspector checks the size and depth of the trench, the steel inside, the spacing of bars and the condition of the soil at the bottom. Only after approval can the concrete be poured.
We plan the schedule around that visit. The crew digs and ties steel, then we call for the inspection, which is usually booked a day or two ahead. If the inspector wants a change, we make it right away and ask for another look. On pour day, the concrete truck arrives only after we have the green light.
It is a good system for concrete footings. Concrete is expensive and cannot be undone, so a second look at the steel is worth a few minutes of waiting. If your project needs a soils report or an engineer's letter, we keep copies on site. Having that paperwork ready makes the inspection smoother. We never skip it, even if a job feels simple.
Can I just pour concrete into post holes for my fence myself?
You can, and many people do. For a simple fence, post holes filled with concrete are common. The hole should be much deeper than wide, the post should be set straight and the concrete should slope slightly away from the post at the top so water does not sit against the wood.
Where people run into trouble is the size and depth. A tall fence or a gate catches wind and swings, and shallow holes cannot handle that. Another mistake is setting posts in soft or wet soil without firming the base. Over time, posts lean, gates drag and boards pull loose.
If you are building a long fence or a tall one, hiring a crew can save headaches. We can dig and pour footings for posts, and we line them up carefully. For retaining walls and anything holding up a structure, we strongly suggest professional work and a permit. If you are unsure, send us a description of the fence, and we will tell you whether a simple hole is enough.
Our lot has a slope. How do footings work on a hill?
Concrete footings on hillside lots need extra planning. The trench for a footing has to follow the slope without letting concrete slide downhill. So concrete footings on a slope are often stepped, with each section level and the steps joined by steel. They may also need to be deeper on the downhill side, to reach firm soil.
Drainage is more important too. Water running down a hillside can wash soil away from a footing or soak the ground beside it. We plan gravel and drains where needed, and we make sure the water has a path to leave. Our retaining wall page covers more about holding back soil.
In hilly parts of Los Gatos, Saratoga and Almaden, the city may require an engineer and a soils report for footings, plus a grading permit. We have worked on those lots and know the paperwork. Bring any plans you have, and ask a designer to mark where the house or deck will sit. We will build to that.
Footings are one of those jobs best planned before the first shovel. Ring (408) 790-0568 or use the estimate form to share your plans.